News

06.11.2015
New simple system parallel operation

In November 2015 the staff NTT Energy held practical training on the new system of synchronization and parallel operation of generators SDMO. The training took place at the factory and covered all the practical aspects of setting up and operating systems.

 
Synchronization System control panel Telys 2 allows you to build parallel systems of DG standard equipment with minimal modifications. For parallel operation signal cables are not required for communication between a domain wall, dividing the load between DG-prois goes automatically and in proportion to their nominal capacity.
 
Capable of handling up to three diesel generators of different capacities for the total load manually (eg for rental DW) or automatic (reserve DW with AVR) mode. Management is simplified as much as possible. In parallel operation ensures high stability (1%) of the output frequency and voltage of the DW.